皇冠足球比分

Shiyan Child Care Home

"Hubei Shiyan Maternal and Child Health Hospital is a specialist, professor-level medical service dedicated to providing convenient, fast and effective services for women and children."

——Shiyan Maternal and Child Health Hospital

主页 > 医院新闻 > 医院新闻 > Position Home > Hospital News > Hospital News >

Top of the logistics support building in the new campus

At 14:00 on June 6, 2019, with the concrete placement of the last party in place, the logistics and security building of the new hospital district of Shiyan Maternal and Child Health Hospital was capped under the joint witness of members of the hospital infrastructure special class, supervision, and project department of the construction party. It marked the completion of the main project of 87,625 square meters of the new campus.

This project was designed by Shandong Architectural Design and Research Institute, and was constructed by Hubei Tianda Construction Industry Co., Ltd. and supervised by Hubei Wide Area Construction Management Co., Ltd. The building is a multi-storey public building with 5 floors above the ground, a total building area of 6762㎡ and a total building height of 22.5 The main functions of this project are: restaurant, warehouse, office, apartment. The original design of the first floor of the logistics building is the same as that of the second floor of the inpatient building. Considering the convenience of the first floor of the inpatient department and the function of ventilation and lighting, the design institute researched that a new underground garage was added to the logistics support building. The first floor has the same elevation, and a corridor is designed between the first floor of the logistics building and the second floor of the inpatient department to make the flow of people and vehicles in the hospital area more reasonable and convenient.

After the main body is capped, the logistics support building will be transferred to the secondary structure and decoration construction. The decoration plan has been determined and it is expected to complete all the projects by the end of August.

 

C: \ Users \ Yu Jingchao \ Desktop \ IMG_9850.JPG